174.8 MW Solar operating in Imperial, CA
174.8 MW
Nameplate Capacity
6
Generators
units
Solar Photovoltaic
Technology
2013
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
32.6908, -115.6441
Reference point calculated from the selected footprint.
PV array footprint
Array footprint from USGS/LBNL imagery. It is not the complete site or a legal parcel.
Source imagery: 2021-02-06.
County
Imperial, CA
Nearby Plants
Voltage information is incomplete along this route; the electrical connection remains unconfirmed.
1 mapped line section connects the two facilities over 2.074 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Centinela Solar Energy LLC | LS Power Development | — |
| Owner(s) | Centinela Solar Energy LLC | LS Power Development | — |
| Status | Operating | operating | — |
The Centinela Solar Energy Project is a 170 megawatt (MW) photovoltaic power plant located on 2,067 acres (836 ha) of previously disturbed private land southwest of El Centro, California. The project planned to provide at least 235 jobs, generate more than $30 million in tax revenue over its life-time, and deliver enough electricity to power about 82,500 homes. Imperial County gave a green-light to the solar power plant on December 27, 2011, and Secretary of the Interior Ken Salazar approved the right-of-way over 19 acres for the connecting power line on public land.
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Centinela Solar Energy is a 174.8 MW solar photovoltaic power plant located in Imperial County, California. The plant began operating in 2013 and consists of 6 generators utilizing single-axis tracking technology. It is owned by LS Power Development and operated by Arevon Energy, Inc. The plant's primary fuel source is solar energy.
In the most recent year of data, Centinela Solar Energy generated 352,741 MWh of electricity, achieving a capacity factor of 23.0%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Centinela Solar Energy is ranked as the 26th largest solar plant in California out of 59, and 304th nationally out of 639. Financial data indicates a power purchase agreement (PPA) price of $149.21 per MWh.
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
19.8K MWh
Latest Month
352.7K MWh
Annual Generation
23.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2014–2024
$11.2/MWh
Energy Value
$9.4/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
Q442GEN_7_N011
Pricing Hub
TH_SP15_GEN-APND
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Centinela Solar Energy
Data-driven briefing on Centinela Solar Energy — fleet, generation, financial, and news signals.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
can you provide me with the capacity factor for allrenewable facilities in 2024