Search plants, projects, owners, and states
1.3 MW Solar operating in Los Angeles, CA
1.3 MW
Nameplate Capacity
3
Generators
units
Solar Photovoltaic
Technology
2003
Operating Since
Coordinates
34.2433, -118.5306
County
Los Angeles, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | California State University, Northridge | — | — |
| Owner(s) | California State University, Northridge | — | — |
| Status | Operating | — | — |
The CSU Northridge Plant, located in Los Angeles County, California, is a 1.4 MW solar photovoltaic facility owned and operated by California State University, Northridge. The plant began operating in 2003 and consists of 3 generators utilizing fixed-tilt solar tracking. It interconnects to the Los Angeles Department of Water and Power balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its latest year of reported generation, the CSU Northridge Plant produced 865 MWh of electricity, achieving a capacity factor of 7.0%. The plant is ranked 659th out of 862 power plants in California and 5932nd out of 7108 plants nationally. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Los Angeles Department of Water and Power (LDWP)
Grid Voltage
35.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
State
Sector
Commercial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
42 MWh
Latest Month
865 MWh
Annual Generation
7.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$3,757/kW
Est. Construction Cost
Total estimated cost: $4.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about CSU Northridge PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.