3 MW BESS operating in Kodiak Island, AK
Outside CONUS — spatial-market dimensions not provided by this dataset.
3 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2012
Operating Since
Coordinates
57.7992, -152.4042
County
Kodiak Island, AK
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Kodiak Electric Assn Inc | — | — |
| Owner(s) | Kodiak Electric Assn Inc | — | — |
| Status | Operating | — | — |
The ESS Battery Microgrid is a 3 MW battery energy storage system (BESS) located in Kodiak Island County, Alaska. The plant, which began operating in 2012, is owned and operated by Kodiak Electric Association Inc. It is the fourth-largest of six battery storage plants in Alaska, and ranks 1077th out of 1205 such plants nationally.
The facility consists of a single generator utilizing lithium-ion battery (LIB) chemistry. With a storage capacity of 3 MWh and a duration of 1 hour, the ESS Battery Microgrid uses "MWH" as its primary fuel type, indicating that it is charged from the grid rather than directly from a generator.
Generated from EIA, GEM, and public data sources
Grid Region
—
Market
—
NERC Region
—
Balancing Authority
—
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−20 MWh
Net Charging
-212 MWh
Annual Net Energy
-0.8%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$913/kW
Est. Construction Cost
Total estimated cost: $2.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about ESS Battery MicrogridForward forecasts, scenario decomposition, and risk-decision tooling for this asset.