1.4 MW Bio. Gas operating in Wyoming, NY
1.4 MW
Nameplate Capacity
1
Generators
unit
Other Waste Biomass
Technology
2011
Operating Since
Coordinates
42.8289, -78.0550
County
Wyoming, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CH4 Biogas LLC | — | — |
| Owner(s) | Synergy Biogas LLC | — | — |
| Status | Operating | — | — |
Synergy Biogas is a 1.4 MW biomass power plant located in Wyoming County, New York. The facility, which began operating in 2011, is owned and operated by CH4 Biogas LLC. The plant utilizes other waste biomass (OBG) as its primary fuel source and consists of a single generator.
In terms of grid context, Synergy Biogas operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. The plant's latest annual generation was 3,839 MWh, achieving a capacity factor of 31.2%. Synergy Biogas is ranked as the second-largest of two biomass plants in New York and 62nd out of 74 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
Commercial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
330 MWh
Latest Month
3.8K MWh
Annual Generation
31.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
70 lb/MWh
SO₂
0.103 lb/MWh
CH₄
0.037 lb/MWh
N₂O
0.004 lb/MWh
Capacity Factor
33.5%
Annual Net Gen
4 GWh
CO₂eq
2 lb/MWh
Subregion
NPCC Upstate NY
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $4.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
GENESE
Node Source
Plant coordinates only
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Synergy BiogasForward forecasts, scenario decomposition, and risk-decision tooling for this asset.