5.8 MW Natural Gas operating in Hartford, CT
5.8 MW
Nameplate Capacity
4
Generators
units
Natural Gas Internal Combustion Engine
Technology
2002
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
41.9271, -72.6831
Reference point reported to EIA.
County
Hartford, CT
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 1.325 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ameresco Select Inc | — | — |
| Owner(s) | Connecticut Airport Authority | — | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Bradley Energy Center is a 5.8 MW natural gas-fired power plant located in Hartford County, Connecticut. The plant began operating in 2002 and is owned and operated by Ameresco Select Inc. It consists of four natural gas-fueled internal combustion engine generators. The facility is located within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year with available data, Bradley Energy Center generated 11,776 MWh of electricity, achieving a capacity factor of 23.1%. The plant ranks 25th out of 49 power plants in Connecticut based on capacity, and 1551st out of 1963 plants nationally.
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
27.6 kV
Regulatory Status
NR — Non-Regulated
Entity Type
State
Sector
Commercial CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.1K MWh
Latest Month
11.8K MWh
Annual Generation
23.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
754 lb/MWh
NOx
17 lb/MWh
SO₂
0.021 lb/MWh
CH₄
0.014 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
25.3%
Annual Net Gen
13 GWh
CO₂eq
754 lb/MWh
Subregion
NPCC New England
2013
$965/kW
Est. Construction Cost
Total estimated cost: $5.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.WNDSRLKS23
Pricing Hub
.Z.CONNECTICUT
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Oxy Renewable Energy queue pipeline — 1 projects by technology and status
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ISO New England
Summary analysis with parallel narrative sections and visualizations.
Bradley Energy Center
Data-driven briefing on Bradley Energy Center — fleet, generation, financial, and news signals.
Oxy Renewable Energy queue pipeline — 1 projects by technology and status
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.