1.6 MW Landfill Gas operating in Solano, CA
1.6 MW
Nameplate Capacity
1
Generators
unit
Landfill Gas
Technology
2013
Operating Since
Coordinates
38.3147, -121.8336
County
Solano, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | G2 Energy LLC | — | — |
| Owner(s) | G2 Energy LLC | — | — |
| Status | Operating | — | — |
G2 Energy Hay Rd is a 1.6 MW landfill gas power plant located in Solano County, California. The plant began operating in 2013 and is owned and operated by G2 Energy LLC. It consists of a single generator utilizing landfill gas as its primary fuel source. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) region.
In its latest year of reported generation, G2 Energy Hay Rd produced 12,161 MWh of electricity, achieving a capacity factor of 86.5%. The plant ranks 33rd out of 40 landfill gas plants in California and 264th out of 284 such plants nationally, based on capacity.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.1K MWh
Latest Month
12.2K MWh
Annual Generation
86.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.353 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
77.3%
Annual Net Gen
11 GWh
CO₂eq
0.000 lb/MWh
Subregion
WECC California
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $5.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
PEABODY_2_N024
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about G2 Energy Hay RdForward forecasts, scenario decomposition, and risk-decision tooling for this asset.