12 MW Natural Gas Internal Combustion Engine (10 MW) + Petroleum Liquids (2 MW) standby in Lucas, OH
12 MW
Nameplate Capacity
6
Generators
units
Hybrid (2)
Technology
Natural Gas Internal Combustion Engine + Petroleum Liquids
2007
Operating Since
Coordinates
41.6883, -83.4847
County
Lucas, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | COT/Division of Water Reclamation | — | — |
| Owner(s) | COT/Division of Water Reclamation | — | — |
| Status | Standby | — | — |
The Bay View Backup Power Facility is a 12 MW hybrid power plant located in Lucas County, Ohio. The plant began operating in 2007 and is owned and operated by the City of Toledo (COT) Division of Water Reclamation. The facility utilizes six generators consisting of natural gas-fired internal combustion engines, with petroleum liquids also listed as a fuel type. It ranks 39th out of 46 power plants in Ohio and 1416th out of 1963 plants nationally.
The Bay View Backup Power Facility operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. The plant's latest annual generation was 629 MWh, resulting in a capacity factor of 0.6%. News coverage of the plant includes 4 articles related to industry, 3 related to regulatory matters, 2 related to hazards, and 1 related to the electric grid.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
84 MWh
Latest Month
629 MWh
Annual Generation
0.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1112 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
26 lb/MWh
SO₂
0.455 lb/MWh
CH₄
0.023 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
0.4%
Annual Net Gen
0 GWh
CO₂eq
1113 lb/MWh
Subregion
RFC West
2013
$765/kW
Est. Construction Cost
Total estimated cost: $9.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Lapier Substation · 138 kV
Substation Distance
3.914 km
Operator
FirstEnergy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
BAYSHOR218 KV BS10
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Bay View Backup Power FacilityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.