13.2 MW Natural Gas operating in Portage, OH
13.2 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2003
Operating Since
Coordinates
43.3466, -83.3840
County
Portage, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Kent State University | — | — |
| Owner(s) | Kent State University | — | — |
| Status | Operating | — | — |
Summit Street Power Plant is a 13.2 MW natural gas-fired combustion turbine facility located in Portage County, Ohio. The plant began operating in 2003 and is owned and operated by Kent State University. It consists of two generators utilizing natural gas as its primary fuel source. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
In the most recent year with available data, Summit Street Power Plant generated 29,261 MWh of electricity, achieving a capacity factor of 25.4%. In terms of size, the plant is ranked 38th out of 46 power plants in Ohio, and 1394th out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
State
Sector
Commercial CHP
2.5K MWh
Latest Month
29.3K MWh
Annual Generation
25.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
610 lb/MWh
NOx
2 lb/MWh
SO₂
0.017 lb/MWh
CH₄
0.012 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
26.8%
Annual Net Gen
31 GWh
CO₂eq
611 lb/MWh
Subregion
RFC West
2013
$965/kW
Est. Construction Cost
Total estimated cost: $12.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
PJM
LMP Node
KENT2 69 KV SUNP_LD
Pricing Hub
AEP-DAYTON HUB
Alt. Hub / Zone
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about Summit Street Power PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo