Search plants, projects, owners, and states
18.8 MW Black Liquor operating in Lincoln, OR
18.8 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
2007
Operating Since
Coordinates
44.6119, -123.9319
County
Lincoln, OR
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Georgia-Pacific Toledo LLC | Georgia-Pacific Toledo LLC | — |
| Owner(s) | Georgia-Pacific Toledo LLC | Koch Industries | — |
| Status | Operating | operating | — |
The Georgia-Pacific Toledo Mill is a biomass-fueled power plant located in Lincoln County, Oregon. The plant has a total capacity of 18.8 MW and began operating in 2007. It is owned by Koch Industries and operated by Georgia-Pacific Toledo LLC. The primary fuel source for the plant is black liquor, a byproduct of the paper pulping process. The plant consists of a single generator utilizing wood/wood waste biomass technology.
In the most recent year of reported data, the Georgia-Pacific Toledo Mill generated 56,198 MWh of electricity, achieving a capacity factor of 34.1%. The plant operates within the Bonneville Power Administration balancing authority and is part of the Western Electricity Coordinating Council (WECC) NERC region. According to state rankings, the plant is the 3rd largest of 3 biomass plants in Oregon. Nationally, it ranks 63rd out of 66 biomass plants.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
5.4K MWh
Latest Month
56.2K MWh
Annual Generation
34.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
318 lb/MWh
NOx
0.594 lb/MWh
SO₂
2 lb/MWh
CH₄
0.030 lb/MWh
N₂O
0.017 lb/MWh
Capacity Factor
36.2%
Annual Net Gen
60 GWh
CO₂eq
324 lb/MWh
Subregion
WECC Northwest
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $65.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
Last updated 2026-03-26
View all 9 articlesNo Ask reports yet for this entity.
Ask about Georgia-Pacific Toledo MillForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo