Search plants, projects, owners, and states
1.1 MW Solar operating in Mercer, NJ
1.1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2012
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
40.2906, -74.6813
Reference point calculated from the selected footprint.
PV array footprint
Array footprint from USGS/LBNL imagery. It is not the complete site or a legal parcel.
Source imagery: 2023-09-21.
County
Mercer, NJ
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
4 mapped line sections connect the two facilities over 9.033 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FRIT Solar Inc | FRIT Solar | — |
| Owner(s) | FRIT Solar Inc | — | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Mercer Mall solar photovoltaic plant is located in Mercer County, New Jersey. The plant has a total capacity of 1.1 MW and consists of a single generator. It began operating in 2012 and is owned and operated by FRIT Solar Inc. The plant utilizes a fixed tilt solar tracking system.
Mercer Mall operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In its latest year of reported generation, the plant produced 1,184 MWh of electricity, achieving a capacity factor of 12.2%. The plant ranks 298th out of 328 solar facilities in New Jersey and 6274th out of 7108 nationally. The plant's primary fuel source is solar.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
86 MWh
Latest Month
1.2K MWh
Annual Generation
12.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2013–2024
$27.2/MWh
Energy Value
$4.1/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Clarksville Substation · 230 kV
Substation Distance
1.292 km
Operator
Public Service Enterprise Group
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
CLARKSVI230 KV CLARKSP
Pricing Hub
WESTERN HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.