10 MW Wind operating in Wheatland, MT
10 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2012
Operating Since
Coordinates
46.2821, -109.4711
County
Wheatland, MT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Musselshell Wind Project LLC | Goldwind | — |
| Owner(s) | Musselshell Wind Project LLC | Potentia Renewables | — |
| Status | Operating | operating | — |
GEM identifies the owner as Potentia Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
The Musselshell Wind Project is a 10 MW wind power plant located in Wheatland County, Montana. The facility, owned and operated by Musselshell Wind Project LLC, commenced operations in 2012. It consists of a single onshore wind turbine generator. The plant utilizes Goldwind GW87 turbines, featuring a rotor diameter of 87 meters and a hub height of 75 meters.
The plant's latest annual generation was 23,090 MWh, resulting in a capacity factor of 26.3%. Musselshell Wind Project operates within the NorthWestern Energy (NWMT) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 20th largest wind farm out of 25 in Montana, and 1142nd out of 1424 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
NorthWestern Energy (NWMT) (NWMT)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Investor-Owned Utility
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.6K MWh
Latest Month
23.1K MWh
Annual Generation
26.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $19.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Musselshell Wind ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.