Search plants, projects, owners, and states
1.5 MW Solar operating in Los Angeles, CA
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2012
Operating Since
Coordinates
34.0087, -117.8456
County
Los Angeles, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Industry - (CA) | City of Industry | — |
| Owner(s) | City of Industry | — | — |
| Status | Operating | operating | — |
Industry MetroLink PV 1 is a 1.5 MW solar photovoltaic power plant located in Los Angeles County, California. The plant began operating in 2012 and is owned and operated by the City of Industry. It utilizes a single generator and fixed-tilt solar tracking. The plant's primary fuel source is solar energy.
In the most recent year of data, Industry MetroLink PV 1 generated 1,136 MWh of electricity, resulting in a capacity factor of 8.6%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Industry MetroLink PV 1 ranks as the 637th largest solar plant in California out of 862, and 5843rd nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
53 MWh
Latest Month
1.1K MWh
Annual Generation
8.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2013–2024
$12.3/MWh
Energy Value
$25.6/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
CAISO
LMP Node
CHINO_6_N108
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Industry MetroLink PV 1Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo