Search plants, projects, owners, and states
50 MW Wind operating in Greene, IA
50 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2012
Operating Since
Coordinates
41.9935, -94.2143
County
Greene, IA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | RPM Access LLC (RPMA) | — |
| Owner(s) | Chevelle Wind Iowa LLC, RPMA Wind Holding I LLC | Greenbacker Renewable Energy Co LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Greenbacker Renewable Energy Co LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Rippey Wind Farm is a 50 MW wind power plant located in Greene County, Iowa. The plant began operating in 2012 and is owned and operated by Greenbacker Renewable Energy Corporation. It consists of a single generator utilizing onshore wind turbine technology. The facility uses Nordex N100 wind turbines, which have a rotor diameter of 100 meters and a hub height of 100 meters.
The plant's latest annual generation was 154,422 MWh, resulting in a capacity factor of 35.2%. Rippey Wind Farm is ranked 70th out of 122 wind plants in Iowa, and 941st out of 1424 nationally. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
161.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
13.7K MWh
Latest Month
154.4K MWh
Annual Generation
35.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $94.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Rippey Wind Farm · 161 kV
Substation Distance
0 km
Operator
Greenbacker Renewable Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
ALTW.RIPPEY1
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Rippey Wind FarmForward forecasts, scenario decomposition, and risk-decision tooling for this asset.