2 MW Landfill Gas operating in Frederick, VA
2 MW
Nameplate Capacity
2
Generators
units
Landfill Gas
Technology
2010
Operating Since
Coordinates
39.1408, -78.0974
County
Frederick, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Frederick County Virginia | — | — |
| Owner(s) | Frederick County Virginia | — | — |
| Status | Operating | — | — |
The Frederick County LFGTE Facility is a 2 MW landfill gas-fueled power plant located in Frederick County, Virginia. The plant began operating in 2010 and is owned and operated by Frederick County Virginia. It consists of two generators utilizing landfill gas as its primary fuel source.
The facility's latest annual generation was 13,047 MWh, achieving a capacity factor of 74.3%. It operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. The Frederick County LFGTE Facility ranks 13th out of 13 similar plants in Virginia and 243rd out of 284 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
Commercial Non-CHP
1.1K MWh
Latest Month
13.0K MWh
Annual Generation
74.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.356 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
53.9%
Annual Net Gen
9 GWh
CO₂eq
0.000 lb/MWh
Subregion
SERC Virginia/Carolina
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $7.0M
Point of Interconnection
Nearest Substation
Greenwood Substation · 138 kV
Substation Distance
< 10 km
Operator
The Potomac Edison Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
83734407
Pricing Hub
DOMINION HUB
Alt. Hub / Zone
WESTERN HUB
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Frederick County LFGTE Facility