19.6 MW Wind operating in Berkshire, MA
19.6 MW
Nameplate Capacity
3
Generators
units
Onshore Wind Turbine
Technology
2011
Operating Since
Coordinates
42.5867, -73.2750
County
Berkshire, MA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Massachusetts Mun Wholes Electric Co | Berkshire Wind Power | — |
| Owner(s) | Berkshire Wind Power Cooperative Corp | Massachusetts Municipal Wholesale Electric Company | — |
| Status | Operating | operating | — |
The Berkshire Wind Power Project is a wind farm on Brodie Mountain in Hancock, Massachusetts. Owned and operated by the Berkshire Wind Power Cooperative Corporation, it is the second largest wind farm in Massachusetts, with 12 GE 1.5 MW wind turbines and a total installed capacity of 19.6 MW. The Berkshire wind power project became fully operational in 2011, and provides enough electricity to power 7,800 homes annually.
Read more on WikipediaThe Berkshire Wind Power Project is a 19.6 MW wind power facility located in Berkshire County, Massachusetts. The plant began operating in 2011 and is owned and operated by the Massachusetts Municipal Wholesale Electric Company. It utilizes three onshore wind turbines manufactured by GE Wind, specifically the GE1.5-77 model, each with a rotor diameter of 77 meters and a hub height of 80 meters. The primary fuel source for the plant is wind (WND).
In the most recent year of data, the Berkshire Wind Power Project generated 41,928 MWh of electricity, achieving a capacity factor of 24.5%. The plant operates within the ISO New England Inc. balancing authority and the NPCC NERC region. It is the third-largest wind power plant in Massachusetts out of 21, and ranks 1094th nationally out of 1424 wind plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
23.0 kV
Regulatory Status
RE — Regulated
Entity Type
Political Subdivision
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.6K MWh
Latest Month
41.9K MWh
Annual Generation
24.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $37.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Stephentown Substation · 115 kV
Substation Distance
< 10 km
Operator
NYSEG
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
UN.PARTRIDG23 BRKW
Pricing Hub
.H.INTERNAL_HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Berkshire Wind Power Project
Data-driven briefing on Berkshire Wind Power Project — fleet, generation, financial, and news signals.
Ip Roman llc
Data-driven briefing on Ma — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.