Search plants, projects, owners, and states
20 MW BESS operating in Rensselaer, NY
20 MW
Nameplate Capacity
1
Generators
unit
Flywheels
Technology
2011
Operating Since
Coordinates
42.5563, -73.3771
County
Rensselaer, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Convergent Energy and Power LP | — | — |
| Owner(s) | Stephentown Spindle, LLC | — | — |
| Status | Operating | — | — |
The Stephentown Spindle is a 20 MW flywheel energy storage facility located in Rensselaer County, New York. The plant, which began operating in 2011, is owned and operated by Convergent Energy and Power LP. It is the 11th largest energy storage plant in New York state out of 65, and ranks 696th nationally out of 1205 similar facilities. The plant has one generator.
The facility's primary fuel source is listed as MWH (megawatt-hours), indicating it stores and discharges electricity rather than consuming a traditional fuel. The Stephentown Spindle operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−308 MWh
Net Charging
-3.5K MWh
Annual Net Energy
-2.0%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$913/kW
Est. Construction Cost
Total estimated cost: $18.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
BEACON___LESR
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
BEACON__LESR
Pricing Hub
NYISO Zone F
Node Source
Shared substation inference
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Stephentown SpindleForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo