Search plants, projects, owners, and states
5.2 MW Distillate Oil operating in New London, CT
5.2 MW
Nameplate Capacity
2
Generators
units
Petroleum Liquids
Technology
2010
Operating Since
Coordinates
41.3469, -72.0411
County
New London, CT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Connecticut Mun Elec Engy Coop | — | — |
| Owner(s) | Connecticut Mun Elec Engy Coop | — | — |
| Status | Operating | — | — |
Water Treatment 1 & 2 is a 5.2 MW petroleum-fueled power plant located in New London County, Connecticut. The plant consists of two generators utilizing petroleum liquids technology. It began operating in 2010 and is owned and operated by Connecticut Municipal Electric Energy Cooperative.
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In the most recent year of reported data, the plant generated 417 MWh of electricity, achieving a capacity factor of 0.9%. Water Treatment 1 & 2 ranks as the 6th largest of 14 petroleum-fueled plants in Connecticut, and 537th nationally out of 886 similar plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
13.8 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
39 MWh
Latest Month
417 MWh
Annual Generation
0.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1588 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
31 lb/MWh
SO₂
3 lb/MWh
CH₄
0.064 lb/MWh
N₂O
0.013 lb/MWh
Capacity Factor
1.1%
Annual Net Gen
0 GWh
CO₂eq
1593 lb/MWh
Subregion
NPCC New England
2013
$765/kW
Est. Construction Cost
Total estimated cost: $4.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.BUDDNGTN33.0
Pricing Hub
.Z.CONNECTICUT
Location Type
NETWORK NODE
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Water Treatment 1 & 2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.