3.2 MW Landfill Gas operating in Lycoming, PA
3.2 MW
Nameplate Capacity
2
Generators
units
Landfill Gas
Technology
2012
Operating Since
Coordinates
41.1511, -76.9178
County
Lycoming, PA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NextEra Renewable Fuels, LLC | — | — |
| Owner(s) | NextEra Renewable Fuels, LLC | — | — |
| Status | Operating | — | — |
The Lycoming County power plant is a 3.2 MW landfill gas (LFG) facility located in Lycoming County, Pennsylvania. It began operating in 2012 and is owned and operated by NextEra Renewable Fuels, LLC. The plant consists of two generators utilizing landfill gas as its primary fuel source. It is interconnected to the grid within the PJM Interconnection, LLC balancing authority, which falls under the RFC NERC region.
In its most recent year of operation, the Lycoming County plant generated 19,895 MWh of electricity, achieving a capacity factor of 70.8%. The plant ranks 13th out of 23 landfill gas plants in Pennsylvania based on capacity, and 184th out of 284 such plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.6K MWh
Latest Month
19.9K MWh
Annual Generation
70.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.396 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
66.3%
Annual Net Gen
19 GWh
CO₂eq
0.000 lb/MWh
Subregion
RFC East
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $11.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Plastic-Vac Substation · 69 kV
Substation Distance
2.758 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
GREATSTR69 KV GRST2_LD
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Lycoming CountyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.