Search plants, projects, owners, and states
2.9 MW Hydro operating in Park, WY
2.9 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1983
Operating Since
Coordinates
44.7264, -108.8644
County
Park, WY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Shoshone Irrigation District | — | — |
| Owner(s) | Shoshone Irrigation District | — | — |
| Status | Operating | — | — |
Garland Canal Power Plant is a 2.9 MW hydroelectric facility located in Park County, Wyoming. The plant began operating in 1983 and has one generator. It is owned and operated by Shoshone Irrigation District, using water (WAT) as its primary fuel source. The plant's output is managed within the PacifiCorp - East balancing authority, operating within the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year with available data, Garland Canal Power Plant generated 8,824 MWh of electricity, achieving a capacity factor of 34.5%. The plant ranks 13th out of 16 power plants in Wyoming based on capacity, and 1097th out of 1464 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
12.7 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Political Subdivision
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
8.8K MWh
Annual Generation
34.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $6.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Garland Canal Power PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.