198 MW Wind operating in Young, TX
198 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
Coordinates
33.4053, -98.6734
County
Young, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Trinity Hills Wind Farm LLC | BP | — |
| Owner(s) | Texas Wind Repower HoldCo, L.P. c/o Concord Infrastructure Investments, LLC, UBS Asset Management (Americas) Inc | Ares Management | — |
| Status | Operating | retired | — |
Trinity Hills is a 198 MW wind power plant located in Young County, Texas. The plant began operating in 2011 and is owned by Ares Management, with Trinity Hills Wind Farm LLC as the listed operator per the EIA. The facility consists of a single generator utilizing onshore wind turbine technology. It is connected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and resides within the TRE NERC region.
The wind farm utilizes Vestas V110-2.2 turbines, characterized by a rotor diameter of 110 meters and a hub height of 80 meters. In its most recent year of operation, Trinity Hills generated 767,441 MWh of electricity, achieving a capacity factor of 44.2%. The plant is ranked as the 113th largest in Texas out of 200 facilities and 372nd nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
77.4K MWh
Latest Month
767.4K MWh
Annual Generation
44.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $375.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
Shared substation inference
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Trinity HillsForward forecasts, scenario decomposition, and risk-decision tooling for this asset.