Search plants, projects, owners, and states
302 MW Wind operating in Van Wert, OH
302 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
40.9315, -84.5618
Reference point reported to EIA.
County
Van Wert, OH
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
1 mapped line section connects the two facilities over 2.652 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | Avangrid |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
The Blue Creek Wind Farm spanning Paulding and Van Wert County became the largest wind farm in the U.S. state of Ohio at approximately 40,500 acres upon its completion in 2012. With a generating capacity of 304 megawatts (MW), it produces enough electricity to service the equivalent of about 76,000 homes. It was the largest private investment in the state in 2011, with the construction alone directly employing about 500 workers. The annual land lease payments, operations and maintenance employment, and property and income tax revenues provide an ongoing stimulus to the local rural economy.
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Blue Creek Wind Project is a 302 MW wind power plant located in Van Wert County, Ohio. The plant began operating in 2011 and is owned and operated by Avangrid Power LLC, a subsidiary of Avangrid. It is the largest of six wind farms in Ohio, and ranks 80th out of 734 wind plants nationally. The facility consists of a single generator utilizing onshore wind turbine technology.
The wind turbines at Blue Creek have a hub height of 100 meters and a rotor diameter of 90 meters. The turbines were manufactured by Gamesa, model G90-2.0. In the most recent year of data, the plant generated 811,429 MWh of electricity, achieving a capacity factor of 30.7%. The Blue Creek Wind Project operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
96.0K MWh
Latest Month
811.4K MWh
Annual Generation
30.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $572.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Blue Creek Substation · 345 kV
Substation Distance
0 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
BLUECREE34.5 KV BLUEC1WF
Pricing Hub
AEP-DAYTON HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-09
View all articlesMax 4 Wind
Data tables and metrics from the InfraSure database.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Wind queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
FPL Energy Oliver Wind I LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.