97.6 MW Wind operating in Barbour, WV
97.6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
39.0072, -79.8866
Reference point reported to EIA.
County
Barbour, WV
The starting substation is nearby, but its connection to this plant is unconfirmed.
2 mapped line sections connect the two facilities over 10.092 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES | — |
| Owner(s) | AES Distributed Energy | AES | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Laurel Mountain Hybrid is a hybrid power plant located in Barbour County, West Virginia. The plant, owned by AES and operated by AES Distributed Energy, has a total capacity of 113.6 MW and began operating in 2011. The facility combines onshore wind turbine technology with battery energy storage. Specifically, it utilizes GE Wind GE1.65-91 wind turbines with a hub height of 80 meters and a rotor diameter of 91 meters. The battery energy storage system (BESS) has a capacity of 16 MWh and a duration of 1 hour, employing lithium-ion battery chemistry.
The plant's primary fuel source is listed as "MWH" in the data, presumably referring to the wind-generated electricity that is both directly fed to the grid and used to charge the batteries. In the most recent year of data, Laurel Mountain Hybrid generated 265,532 MWh, resulting in a capacity factor of 26.8%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. Laurel Mountain Hybrid is ranked as the second largest of two hybrid plants in West Virginia, and 451st out of 514 hybrid plants nationally.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
27.3K MWh
Latest Month
265.5K MWh
Annual Generation
31.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $185.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
LEADSVIL34.5 KV LAURMTBT
Pricing Hub
AEP-DAYTON HUB
Alt. Hub / Zone
WESTERN HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesAES queue pipeline by technology
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
AES ES GILBERT
Data-driven briefing on AES — fleet, generation, financial, and news signals.
Laurel Mountain Hybrid
Data-driven briefing on Laurel Mountain Hybrid — fleet, generation, financial, and news signals.
AES Petersburg
Data-driven briefing on AES — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.