Search plants, projects, owners, and states
4.8 MW Landfill Gas operating in Benton, TN
4.8 MW
Nameplate Capacity
3
Generators
units
Landfill Gas
Technology
2012
Operating Since
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
West Camden is a 4.8 MW landfill gas-fueled power plant located in Benton County, Tennessee. The facility began operating in 2012 and is owned by Waste Management, with WM Renewable Energy LLC as the listed operator per EIA data. The plant consists of 3 generators utilizing landfill gas technology. It is connected to the Tennessee Valley Authority balancing authority within the SERC NERC region.
West Camden's latest annual generation was 38,060 MWh, achieving a capacity factor of 90.3%. Among landfill gas plants in Tennessee, West Camden is ranked 1 out of 3. Nationally, it is ranked 126 out of 284 landfill gas plants.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tennessee Valley Authority (TVA)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.2K MWh
Latest Month
38.1K MWh
Annual Generation
90.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.337 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
92.7%
Annual Net Gen
39 GWh
CO₂eq
0.000 lb/MWh
Subregion
SERC Tennessee Valley
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $16.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
LMP Node
TVA
Pricing Hub
—
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about West CamdenForward forecasts, scenario decomposition, and risk-decision tooling for this asset.