14 MW Geothermal operating in Beaver, UT
14 MW
Nameplate Capacity
1
Generators
unit
Geothermal
Technology
2013
Operating Since
Coordinates
38.1607, -113.1945
County
Beaver, UT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Thermo No 1 BE 01 LLC | Thermo No 1 BE 01 LLC | — |
| Owner(s) | Thermo No 1 BE 01 LLC | Thermo No 1 BE 01 LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Thermo No 1 BE 01 LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Thermo No 1 is a 14 MW geothermal power plant located in Beaver County, Utah. The plant, which began operating in 2013, is owned and operated by Thermo No 1 BE 01 LLC. It consists of a single generator utilizing geothermal technology and is fueled by geothermal resources (GEO). Thermo No 1 ranks as the fourth-largest geothermal plant in Utah out of five such plants, and 62nd nationally out of 70.
The plant operates within the PacifiCorp - East balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In its latest year of reported generation, Thermo No 1 produced 57,730 MWh of electricity, achieving a capacity factor of 47.0%.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
24.9 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
5.3K MWh
Latest Month
57.7K MWh
Annual Generation
47.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.000 lb/MWh
CH₄
—
N₂O
—
Capacity Factor
44.7%
Annual Net Gen
55 GWh
CO₂eq
0.000 lb/MWh
Subregion
WECC Northwest
2013
$2,851/kW
Est. Construction Cost
Total estimated cost: $39.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Thermo No 1Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.