151.2 MW Wind operating in Klickitat, WA
151.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
Coordinates
45.9192, -120.2176
County
Klickitat, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
The Juniper Canyon I Wind Project is a 151.2 MW wind power plant located in Klickitat County, Washington. The plant began operating in 2011 and is owned and operated by Avangrid Power LLC, a subsidiary of Avangrid. It utilizes a single generator consisting of multiple onshore wind turbines. The plant is ranked as the 10th largest wind facility in Washington state out of 17, and 475th nationally out of 734.
The facility uses Gamesa G90-2.0 wind turbines, which have a rotor diameter of 90 meters and a hub height of 78 meters. In the most recent year of data, the plant generated 144,424 MWh of electricity, achieving a capacity factor of 10.9%. The balancing authority for the plant is Avangrid Renewables LLC, and it operates within the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Avangrid Renewables LLC (AVRN)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
144.4K MWh
Annual Generation
10.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $286.6M
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
Last updated 2026-03-26