150 MW Wind operating in Kern, CA
150 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
Coordinates
42.2346, -93.3886
County
Kern, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Alta Wind II, LLC | Longroad Energy | — |
| Owner(s) | NRG Renew | Everpower | — |
| Status | Operating | operating | — |
GEM identifies the owner as Everpower
This entity is not yet in the GEM ownership database — chain unavailable.
Alta Wind Energy Center II is a 150 MW wind power plant located in Kern County, California. The facility, which began operating in 2011, is owned and operated by Alta Wind II, LLC. It utilizes a single generator consisting of onshore wind turbine technology. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
The facility's wind turbines have a hub height of 80 meters and a rotor diameter of 90 meters. The turbines were manufactured by Vestas, and the model is V90-3.0. In its most recent year of operation, the plant generated 364,602 MWh, achieving a capacity factor of 27.6%. Alta Wind Energy Center II ranks as the 9th largest wind farm out of 28 in California, and 519th out of 734 nationally. The plant has a reported power purchase agreement (PPA) price of $11.73 per MWh, according to FERC data.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
220.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
17.7K MWh
Latest Month
364.6K MWh
Annual Generation
27.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Alta Wind II, LLC · Data from 2019–2025
$11.7/MWh
PPA Price
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
TOT162W3_6_GN001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Alta Wind Energy Center IIForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
BLM approved right-of-way for the Alta Wind Battery Energy Storage System co-located in Kern County, CA, enabling a planned storage addition at the Alta Wind complex.
source