300 MW Wind operating in Webb, TX
300 MW
Nameplate Capacity
2
Generators
units
Onshore Wind Turbine
Technology
2010
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
27.5761, -98.9053
Reference point reported to EIA.
County
Webb, TX
Nearby Plants
The route starts at a transmission substation on the mapped site; its link to the plant’s generation equipment is unconfirmed.
1 mapped line section connects the two facilities over 13.304 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cedro Hill Wind, LLC | Clearway Energy Group | — |
| Owner(s) | Cedro Hill Wind, LLC | Clearway Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Cedro Hill Wind LLC is a 300 MW wind power plant located in Webb County, Texas. The plant began operating in 2010 and is owned and operated by Cedro Hill Wind, LLC, a subsidiary of Clearway Energy. The facility consists of two generators utilizing onshore wind turbine technology. The wind turbines have a hub height of 80 meters and a rotor diameter of 82.5 meters, and were manufactured by GE Wind, model GE1.5-82.5.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. In the most recent year of data, Cedro Hill Wind generated 344,535 MWh, achieving a capacity factor of 13.1%. Cedro Hill Wind ranks as the 33rd largest wind farm in Texas out of 200, and 94th nationally out of 734 wind plants.
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
32.5K MWh
Latest Month
344.5K MWh
Annual Generation
13.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $568.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Cedro Hill Substation · 138 kV
Substation Distance
< 10 km
Operator
Cedro Hill Wind
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
ERCOT
Pricing Hub
HB_SOUTH
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Max 4 Wind
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Clearway Energy Group closes $261M project-finance facility with four-bank consortium (DNB Markets, CIBC, National Australia Bank, DZ Bank) to fund Cedro Hill wind farm repowering.
sourceClearway completes repowering construction of Cedro Hill wind farm in Webb County, TX; new reported capacity is 160 MW.
source