9 MW Hydro operating in Marinette, WI
9 MW
Nameplate Capacity
6
Generators
units
Conventional Hydroelectric
Technology
1900
Operating Since
Coordinates
45.7736, -87.9894
County
Marinette, WI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Eagle Creek Renewable Energy, LLC | — | — |
| Owner(s) | Northbrook Wisconsin, LLC | — | — |
| Status | Operating | — | — |
The Little Quinnesec Falls Hydro Project is a 9 MW hydroelectric power plant located in Marinette County, Wisconsin. The plant began operating in 1900 and consists of six generators utilizing conventional hydroelectric technology. It is owned and operated by Eagle Creek Renewable Energy, LLC. The plant uses water (WAT) as its primary fuel source.
In the most recent year of data, the Little Quinnesec Falls Hydro Project generated 56,603 MWh of electricity, achieving a capacity factor of 71.7%. The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the Midwest Reliability Organization (MRO) NERC region. It is ranked as the 19th largest of 65 hydroelectric plants in Wisconsin, and 693rd largest of 1464 hydroelectric plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4.6K MWh
Latest Month
56.6K MWh
Annual Generation
71.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $20.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Niagara Paper of Wisconsin · 138 kV
Substation Distance
< 10 km
Operator
American Transmission Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
MIUP.LITTLEQUIN
Pricing Hub
MICHIGAN.HUB
Alt. Hub / Zone
MINN.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Little Quinnesec Falls Hydro ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.