19.5 MW Wind operating in Bowman, ND
19.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2010
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
46.2456, -103.7672
Reference point reported to EIA.
County
Bowman, ND
Nearby Plants
The line is mapped. The plant’s electrical connection and official point of interconnection still need confirmation.
1 mapped line section connects the two facilities over 9.293 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Montana-Dakota Utilities Co | Montana-Dakota Utilities | — |
| Owner(s) | Montana-Dakota Utilities Co | small shareholder(s) | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Cedar Hills Wind Farm is a 19.5 MW wind power facility located in Bowman County, North Dakota. The plant began operating in 2010 and is owned by a group of small shareholders, with Montana-Dakota Utilities Co. serving as the operator. The facility consists of a single generator utilizing onshore wind turbine technology. The wind turbines have a hub height of 80 meters and a rotor diameter of 77 meters, and were manufactured by GE Wind, model GE1.5-77.
The plant's latest annual generation was 55,563 MWh, resulting in a capacity factor of 32.5%. Cedar Hills Wind Farm operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region. The plant ranks 40th out of 42 wind facilities in North Dakota, and 1097th out of 1424 nationally. Financial data indicates an installed cost of $2370.32 per kW.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
57.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4.9K MWh
Latest Month
55.6K MWh
Annual Generation
32.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Wind · MDU Resources Group, Inc. · Data from 2015–2024
$2,384/kW
Installed Cost
$9.9/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Cedar Hills Substation · 57 kV
Substation Distance
< 10 km
Operator
Montana-Dakota Utilities
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
MDU.CEDARHLS
Pricing Hub
MINN.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.