Search plants, projects, owners, and states
4 MW Landfill Gas operating in Collier, FL
4 MW
Nameplate Capacity
5
Generators
units
Landfill Gas
Technology
2011
Operating Since
Coordinates
26.1558, -81.6581
County
Collier, FL
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
The Waste Management Naples LFGTE Project is a 4 MW landfill gas-to-energy (LFGTE) plant located in Collier County, Florida. The plant began operating in 2011 and is owned by Waste Management, with WM Renewable Energy LLC listed as the operator. It utilizes landfill gas as its primary fuel source and consists of 5 generators.
The plant's latest annual generation was 23,444 MWh, achieving a capacity factor of 66.7%. The Waste Management Naples LFGTE Project connects to the grid within the Florida Power & Light Company balancing authority and the SERC NERC region. Among landfill gas plants in Florida, it is ranked 8 out of 12, and nationally it is ranked 146 out of 284.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Florida Power & Light Company (FPL)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
2.0K MWh
Latest Month
23.4K MWh
Annual Generation
66.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.429 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
69.9%
Annual Net Gen
24 GWh
CO₂eq
0.000 lb/MWh
Subregion
FRCC All
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $14.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
LMP Node
FP&L
Pricing Hub
—
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Waste Management Naples LFGTE ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo