Search plants, projects, owners, and states
3.2 MW Landfill Gas operating in Denton, TX
3.2 MW
Nameplate Capacity
2
Generators
units
Landfill Gas
Technology
2011
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
33.0311, -96.9572
Reference point reported to EIA.
County
Denton, TX
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
5 mapped line sections connect the two facilities over 3.539 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Farmers Branch Renewable Energy Facility is a 3.2 MW landfill gas-fueled power plant located in Denton County, Texas. The plant began operating in 2011 and is owned by Waste Management, with WM Renewable Energy LLC as the listed operator. It consists of two generators utilizing landfill gas technology.
The facility operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. In the most recent year of reported data, the plant generated 23,725 MWh of electricity, achieving a capacity factor of 84.4%. Among landfill gas plants in Texas, the Farmers Branch Renewable Energy Facility is ranked 7th out of 7, and it holds a national ranking of 187 out of 284 similar facilities.
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
24.9 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.0K MWh
Latest Month
23.7K MWh
Annual Generation
84.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.395 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
86.0%
Annual Net Gen
24 GWh
CO₂eq
0.000 lb/MWh
Subregion
ERCOT All
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $11.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
COSERV
Pricing Hub
HB_NORTH
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Farmers Branch Renewable Energy Facility
Data-driven briefing on Farmers Branch Renewable Energy Facility — fleet, generation, financial, and news signals.
Waste Management Naples LFGTE Project
Data-driven briefing on Waste Management — fleet, generation, financial, and news signals.
Waste Management Crossroads LFGTE
Data-driven briefing on Waste Management — fleet, generation, financial, and news signals.
Waste Water Plant Generator
Data-driven briefing on Waste Management — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.