Search plants, projects, owners, and states
9.6 MW Landfill Gas operating in Duval, FL
9.6 MW
Nameplate Capacity
6
Generators
units
Landfill Gas
Technology
2008
Operating Since
Coordinates
30.2280, -82.0409
County
Duval, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NextEra Renewable Fuels, LLC | — | — |
| Owner(s) | NextEra Renewable Fuels, LLC | — | — |
| Status | Operating | — | — |
Trail Ridge Landfill Gas Recovery is a 9.6 MW landfill gas-fueled power plant located in Duval County, Florida. The facility began operating in 2008 and consists of six generators utilizing landfill gas technology. It is owned and operated by NextEra Renewable Fuels, LLC. The plant's balancing authority is JEA, and it operates within the SERC NERC region.
In the most recent year of reported data, Trail Ridge Landfill Gas Recovery generated 26,380 MWh of electricity, achieving a capacity factor of 31.3%. The plant is a significant contributor to landfill gas-based power generation, ranking 3rd out of 12 such facilities in Florida and 38th out of 284 nationwide.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
JEA (JEA)
Grid Voltage
23.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.3K MWh
Latest Month
26.4K MWh
Annual Generation
31.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.376 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
29.9%
Annual Net Gen
25 GWh
CO₂eq
0.000 lb/MWh
Subregion
FRCC All
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $33.6M
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Trail Ridge Landfill Gas Recovery