Search plants, projects, owners, and states
17 MW Wind operating in Natrona, WY
17 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2009
Operating Since
Coordinates
41.6799, -71.7146
County
Natrona, WY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Chevron USA | EnXco Service | — |
| Owner(s) | Chevron USA | Chevron | — |
| Status | Operating | operating | — |
Casper Wind Farm is a 17 MW wind power plant located in Natrona County, Wyoming. The facility began operating in 2009 and is owned and operated by Chevron USA, a subsidiary of Chevron. The plant utilizes a single onshore wind turbine manufactured by GE Wind, model GE1.5-77. The turbine has a rotor diameter of 77 meters and a hub height of 80 meters.
The Casper Wind Farm operates within the PacifiCorp - East balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant is ranked 33rd out of 34 wind facilities in Wyoming, and 1105th out of 1424 nationally. The plant's primary fuel source is wind (WND).
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $32.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Casper Wind FarmForward forecasts, scenario decomposition, and risk-decision tooling for this asset.