150 MW Wind operating in McIntosh, ND
150 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2020
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
46.1075, -99.0592
Reference point reported to EIA.
County
McIntosh, ND
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 0.005 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Otter Tail Power Co | Otter Tail Power | — |
| Owner(s) | Otter Tail Power Co | Otter Tail | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Merricourt Wind Energy Center is a 150 MW wind power plant located in McIntosh County, North Dakota. The plant began operating in 2020 and is owned and operated by Otter Tail Power Co, a subsidiary of Otter Tail. It utilizes onshore wind turbine technology, consisting of one generator. The facility's turbines have a hub height of 80 meters and a rotor diameter of 110 meters, and were manufactured by Vestas, model V110-2.0.
In its most recent year of operation, the Merricourt Wind Energy Center generated 583,545 MWh of electricity, achieving a capacity factor of 44.5%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. The installed cost of the facility was $2004.1 per kW, according to FERC data. The Merricourt Wind Energy Center is ranked as the 14th largest wind farm in North Dakota out of 27, and 481st nationally out of 734.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
39.9K MWh
Latest Month
583.5K MWh
Annual Generation
44.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Wind · Otter Tail Power Company · Data from 2020–2024
$1,817/kW
Installed Cost
$9281.3/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Merricourt Windfarm Substation · 230 kV
Substation Distance
< 10 km
Operator
Montana-Dakota Utilities
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
MDU.MERICOURT
Pricing Hub
MINN.HUB
Node Source
EIA-860 direct report
2 buyers • 2 active contracts
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.