736 MW Natural Gas operating in Cleveland, NC
736 MW
Nameplate Capacity
4
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2012
Operating Since
Coordinates
35.1698, -81.4172
County
Cleveland, NC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Southern Power Co | Southern Power | — |
| Owner(s) | Southern Power Co | Southern | — |
| Status | Operating | — | — |
Cleveland County Generating Facility is a 736 MW natural gas-fired power plant located in Cleveland County, North Carolina. The plant began operating in 2012 and consists of four natural gas-fired combustion turbine generators. It is owned by Southern Company and operated by Southern Power Company.
The plant operates within the Duke Energy Carolinas balancing authority and the SERC NERC region. In its most recent year of operation, the plant generated 712,006 MWh of electricity, achieving a capacity factor of 11.0%. Cleveland County Generating Facility is ranked as the 10th largest power plant in North Carolina (out of 16 plants) and 283rd largest nationally (out of 945 plants).
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Carolinas (DUK)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Investor-Owned Utility
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
6.5K MWh
Latest Month
712.0K MWh
Annual Generation
11.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1224 lb/MWh
NOx
0.310 lb/MWh
SO₂
0.006 lb/MWh
CH₄
0.023 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
9.9%
Annual Net Gen
641 GWh
CO₂eq
1225 lb/MWh
Subregion
SERC Virginia/Carolina
2013
$965/kW
Est. Construction Cost
Total estimated cost: $710.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Cleveland Cnty Generating FacilityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.