Search plants, projects, owners, and states
1.6 MW Landfill Gas operating in Clare, MI
1.6 MW
Nameplate Capacity
1
Generators
unit
Landfill Gas
Technology
2010
Operating Since
Coordinates
43.9906, -84.8003
County
Clare, MI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
Waste Management Northern Oaks LFGTE is a 1.6 MW landfill gas-fueled power plant located in Clare County, Michigan. The plant began operating in 2010 and has one generator. It is owned by Waste Management, and operated by WM Renewable Energy LLC. The plant's location places it within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the ReliabilityFirst Corporation (RFC) NERC region.
In the most recent year of data, the plant generated 5,949 MWh of electricity, achieving a capacity factor of 42.3%. Based on capacity, the plant ranks 22nd out of 22 power plants in Michigan, and 249th out of 284 landfill gas plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
13.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
407 MWh
Latest Month
5.9K MWh
Annual Generation
42.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.365 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
56.9%
Annual Net Gen
8 GWh
CO₂eq
0.000 lb/MWh
Subregion
RFC Michigan
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $5.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Larch Generating · 46 kV
Substation Distance
< 10 km
Operator
Consumers Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
Zonal
Pricing Hub
MICHIGAN.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Waste Management Northern Oaks LFGTEForward forecasts, scenario decomposition, and risk-decision tooling for this asset.