6.4 MW Landfill Gas operating in Middlesex, VA
6.4 MW
Nameplate Capacity
8
Generators
units
Landfill Gas
Technology
2009
Operating Since
Coordinates
37.5197, -76.6244
County
Middlesex, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
Waste Management Middle Peninsula LFGTE is a 6.4 MW landfill gas-fueled power plant located in Middlesex County, Virginia. The plant began operating in 2009 and has 8 generators utilizing landfill gas technology. It is owned by Waste Management and operated by WM Renewable Energy LLC. The plant ranks 7th out of 13 landfill gas plants in Virginia, and 75th out of 284 such plants nationally.
The plant operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. In the most recent year of data, Waste Management Middle Peninsula LFGTE generated 49,786 MWh of electricity, achieving a capacity factor of 88.6%.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
37.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4.2K MWh
Latest Month
49.8K MWh
Annual Generation
88.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.375 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
89.3%
Annual Net Gen
50 GWh
CO₂eq
0.000 lb/MWh
Subregion
SERC Virginia/Carolina
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $22.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
PNODE74008741
Pricing Hub
DOMINION HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Waste Management Middle Peninsula LFGTEForward forecasts, scenario decomposition, and risk-decision tooling for this asset.