3.2 MW Landfill Gas operating in Somerset, ME
3.2 MW
Nameplate Capacity
2
Generators
units
Landfill Gas
Technology
2009
Operating Since
Coordinates
44.7014, -69.8319
County
Somerset, ME
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
Waste Management Crossroads LFGTE is a 3.2 MW landfill gas-fueled power plant located in Somerset County, Maine. The plant began operating in 2009 and is owned by Waste Management, with WM Renewable Energy LLC as the listed operator. It consists of two generators utilizing landfill gas technology. The plant is the only one of its kind in the state of Maine, and ranks 203rd out of 284 similar plants nationally.
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In the most recent year of data, the plant generated 18,403 MWh of electricity, achieving a capacity factor of 65.5%.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
1.5K MWh
Latest Month
18.4K MWh
Annual Generation
65.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.369 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
69.6%
Annual Net Gen
20 GWh
CO₂eq
0.000 lb/MWh
Subregion
NPCC New England
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $11.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.MADISON 115 (4136)
Pricing Hub
.Z.MAINE
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Waste Management Crossroads LFGTEForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo