Search plants, projects, owners, and states
1 MW Solar operating in Solano, CA
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2008
Operating Since
Coordinates
38.4064, -121.9512
County
Solano, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SunE U6 Holdings LLC | SunE U6 Holdings | — |
| Owner(s) | SunE U6 Holdings LLC | — | Mariani Packing Company |
| Status | Operating | operating | — |
Mariani Packing Vacaville Solar is a 1 MW solar photovoltaic power plant located in Solano County, California. The plant began operating in 2008 and has a single generator utilizing single-axis tracking. It is owned and operated by SunE U6 Holdings LLC. The plant's primary fuel source is solar energy.
The facility operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Mariani Packing Vacaville Solar ranks as the 769th largest solar plant in California out of 862, and 6323rd nationally out of 7108. The plant's latest annual generation was 1253 MWh, resulting in a capacity factor of 14.3%.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
22 MWh
Latest Month
1.3K MWh
Annual Generation
14.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$3,757/kW
Est. Construction Cost
Total estimated cost: $3.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Liquid Carbonic
Substation Distance
3.454 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
VACADIX_1_GN001
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Mariani Packing Vacaville SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo