Search plants, projects, owners, and states
6.4 MW Landfill Gas operating in Clinton, NY
6.4 MW
Nameplate Capacity
4
Generators
units
Landfill Gas
Technology
2008
Operating Since
Coordinates
44.6917, -73.5944
County
Clinton, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Casella Waste Systems | — | — |
| Owner(s) | Casella Waste Systems | — | — |
| Status | Operating | — | — |
The Clinton LFGTE Facility is a 6.4 MW landfill gas-to-energy (LFGTE) power plant located in Clinton County, New York. The plant began operating in 2008 and is owned and operated by Gibson County Generation LLC. It utilizes four generators to convert landfill gas into electricity. The facility operates within the New York Independent System Operator (NYISO) balancing authority and is situated in the Northeast Power Coordinating Council (NPCC) NERC region.
In its latest year of reported generation, the Clinton LFGTE Facility produced 47,828 MWh of electricity, achieving a capacity factor of 85.0%. Among landfill gas plants in New York, the facility ranks 9th out of 16 in terms of capacity. Nationally, it holds a rank of 65 out of 284 landfill gas plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
46.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
—
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4.1K MWh
Latest Month
47.8K MWh
Annual Generation
85.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.370 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
84.4%
Annual Net Gen
47 GWh
CO₂eq
0.000 lb/MWh
Subregion
NPCC Upstate NY
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $22.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
CLINTON___LFGE
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NORTH
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Clinton LFGTE FacilityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.