58.8 MW Wind operating in Howard, TX
58.8 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
32.1217, -101.3853
Reference point reported to EIA.
County
Howard, TX
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 5.781 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Deriva Energy | Duke Energy | — |
| Owner(s) | Ocotillo Windpower LP | Clearway Energy | — |
| Status | Operating | retired | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Ocotillo Windpower is a 58.8 MW wind power plant located in Howard County, Texas. The plant began operating in 2008 and utilizes a single generator consisting of onshore wind turbines. The facility is owned by Clearway Energy and operated by Duke Energy Renewables Services. The primary fuel source is wind (WND).
The plant's wind turbines have a hub height of 79 meters and a rotor diameter of 88 meters. The turbines were manufactured by Suzlon and are model S88. In the most recent year of data, Ocotillo Windpower generated 80,895 MWh, achieving a capacity factor of 15.7%. The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region. Ocotillo Windpower is ranked 222 out of 245 wind plants in Texas and 900 out of 1424 nationally.
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4.4K MWh
Latest Month
80.9K MWh
Annual Generation
15.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $111.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Elbow Creek Wind Farm · 345 kV
Substation Distance
1.053 km
Operator
NRG Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
ELB_ELBCREEK
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-09
View all articlesWhat is the total generation capacity of Duke Energy's 208 plants, broken down by energy source?
Structured data lookup for Duke Energy with rankings and aggregations.
Ocotillo Windpower
Data-driven briefing on Ocotillo Windpower — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.