180 MW Wind operating in Borden, TX
180 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
32.9323, -101.5794
County
Borden, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bull Creek Wind LLC | Eurus Energy | — |
| Owner(s) | Bull Creek Wind LLC | Eurus Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as Eurus Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Bull Creek Wind is a 180 MW wind power plant located in Borden County, Texas. The plant began operating in 2008 and is owned and operated by Bull Creek Wind LLC. The facility consists of one generator utilizing onshore wind turbine technology. It is interconnected to the Electric Reliability Council of Texas (ERCOT) balancing authority.
The plant's wind turbines have a hub height of 69 meters and a rotor diameter of 61.4 meters. The turbines were manufactured by Mitsubishi, model MWT62/1.0. In its latest year of reported generation, Bull Creek Wind produced 265,228 MWh of electricity, achieving a capacity factor of 16.8%. Bull Creek Wind ranks 125th out of 200 wind plants in Texas and 401st out of 734 wind plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
20.3K MWh
Latest Month
265.2K MWh
Annual Generation
16.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $341.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Bull Creek Wind Substation · 138 kV
Substation Distance
0 km
Operator
Eurus Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
BULLCRK_1_2
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Bull Creek WindForward forecasts, scenario decomposition, and risk-decision tooling for this asset.