Search plants, projects, owners, and states
1320 MW Natural Gas operating in Pinal, AZ
1,320 MW
Nameplate Capacity
24
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2011
Operating Since
Coordinates
32.9174, -111.5033
County
Pinal, AZ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Salt River Project | Salt River Project | — |
| Owner(s) | Salt River Project | Salt River Project | — |
| Status | Operating | — | — |
Coolidge Generation Station is a 726 MW natural gas-fired power plant located in Pinal County, Arizona. The plant began operating in 2011 and is owned and operated by Salt River Project. It consists of 12 natural gas-fired combustion turbine generators. The plant is located within the Salt River Project balancing authority area and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year of record, the Coolidge Generation Station produced 58,818 MWh of electricity, operating at a capacity factor of 0.9%. The plant is the 9th largest in Arizona out of 26 plants, and ranks 291st nationally out of 945 plants.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Salt River Project (SRP)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Political Subdivision
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.5K MWh
Latest Month
58.8K MWh
Annual Generation
0.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1260 lb/MWh
NOx
0.213 lb/MWh
SO₂
0.006 lb/MWh
CH₄
0.023 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
6.6%
Annual Net Gen
422 GWh
CO₂eq
1261 lb/MWh
Subregion
WECC Southwest
2013
$965/kW
Est. Construction Cost
Total estimated cost: $700.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-09
View all articlesNo Ask reports yet for this entity.
Ask about Coolidge Generation StationForward forecasts, scenario decomposition, and risk-decision tooling for this asset.