Search plants, projects, owners, and states
9.2 MW Landfill Gas out of service in Los Angeles, CA
9.2 MW
Nameplate Capacity
2
Generators
units
Landfill Gas
Technology
2010
Operating Since
Coordinates
34.4317, -118.6429
County
Los Angeles, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AMERESCO Chiquita Canyon LLC | — | — |
| Owner(s) | AMERESCO Chiquita Canyon LLC | — | — |
| Status | Out of service | — | — |
Ameresco Chiquita Canyon is a 9.2 MW landfill gas power plant located in Los Angeles County, California. The facility began operating in 2010 and is owned and operated by AMERESCO Chiquita Canyon LLC. It consists of two generators utilizing landfill gas as its primary fuel source. The plant is interconnected to the California Independent System Operator (CAISO) grid, falling within the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year with available data, the plant generated 2,087 MWh of electricity, achieving a capacity factor of 2.6%. Ameresco Chiquita Canyon ranks as the 7th largest landfill gas plant out of 40 in California, and 45th out of 284 such plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
16.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
185 MWh
Latest Month
2.1K MWh
Annual Generation
2.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.555 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
40.5%
Annual Net Gen
33 GWh
CO₂eq
0.000 lb/MWh
Subregion
WECC California
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $32.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Ameresco Chiquita CanyonForward forecasts, scenario decomposition, and risk-decision tooling for this asset.