3 MW Landfill Gas operating in Cole, MO
3 MW
Nameplate Capacity
3
Generators
units
Landfill Gas
Technology
2009
Operating Since
Coordinates
38.5524, -92.0449
County
Cole, MO
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AMERESCO Jefferson City LLC | — | — |
| Owner(s) | AMERESCO Jefferson City LLC | — | — |
| Status | Operating | — | — |
Ameresco Jefferson City is a 3 MW landfill gas power plant located in Cole County, Missouri. The plant began operating in 2009 and is owned and operated by AMERESCO Jefferson City LLC. It consists of three generators utilizing landfill gas as its primary fuel source. The plant's location places it within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region.
In the most recent year of data, Ameresco Jefferson City generated 19,869 MWh of electricity, achieving a capacity factor of 75.4%. The plant is ranked as the 3rd largest of 4 landfill gas plants in Missouri, and 218th out of 284 landfill gas plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.7K MWh
Latest Month
19.9K MWh
Annual Generation
75.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.325 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
85.3%
Annual Net Gen
22 GWh
CO₂eq
0.000 lb/MWh
Subregion
SERC Midwest
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $10.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Mariosa Delta Substation · 345 kV
Substation Distance
< 10 km
Operator
Ameren
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Ameresco Jefferson CityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.