10 MW Wind operating in Moore, TX
10 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
35.8119, -101.9789
County
Moore, TX
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | UPC Power Solutions | Exelon | — |
| Owner(s) | UPC Power Solutions | GlidePath | — |
| Status | Operating | operating | — |
GEM identifies the owner as GlidePath
This entity is not yet in the GEM ownership database — chain unavailable.
Ribeye Wind (11) LLC is a 10 MW wind power plant located in Moore County, Texas. The plant began operating in 2008 and is owned and operated by UPC Power Solutions. It consists of a single onshore wind turbine. Ribeye Wind (11) LLC is ranked 235th out of 245 wind plants in Texas and 1157th out of 1424 nationally.
The plant utilizes a Suzlon S64 wind turbine, which has a rotor diameter of 64 meters and a hub height of 74.5 meters. In the most recent year of data, the plant generated 5,913 MWh of electricity, resulting in a capacity factor of 6.7%. The plant operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.1K MWh
Latest Month
5.9K MWh
Annual Generation
6.7%
Capacity Factor
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $19.0M
Market Position
ISO/RTO Market
SPP
LMP Node
SPS.GGPO.STOCKYARD10_11
Pricing Hub
SPP South Hub
Location Type
Settlement Location
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.