49.5 MW Wind operating in Pipestone, MN
49.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2009
Operating Since
Coordinates
44.1025, -96.0562
County
Pipestone, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
Moraine II Wind LLC is a 49.5 MW wind power plant located in Pipestone County, Minnesota. The plant began operating in 2009 and is owned by Avangrid, with Avangrid Power LLC as the operator. It consists of a single generator utilizing onshore wind turbine technology. The facility is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) and resides within the MRO NERC region.
The plant utilizes GE Wind GE1.5-77 wind turbines, featuring a rotor diameter of 77 meters and a hub height of 80 meters. In the most recent year of reported data, Moraine II Wind generated 72,881 MWh of electricity, achieving a capacity factor of 16.7%. The plant is ranked as the 33rd largest wind facility in Minnesota out of 123, and 949th nationally out of 1424 wind plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
8.3K MWh
Latest Month
72.9K MWh
Annual Generation
16.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $93.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Tholen Interconnection Station · 35 kV
Substation Distance
0 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.MORAINE2
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Moraine II Wind LLC