Search plants, projects, owners, and states
21 MW Wood Waste operating in Linn, OR
21 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
2007
Operating Since
Coordinates
44.7707, -122.6121
County
Linn, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Invenergy Services LLC | Evergreen BioPower LLC | — |
| Owner(s) | Evergreen BioPower LLC | Freres Lumber Co | — |
| Status | Operating | operating | — |
Evergreen BioPower LLC is a 21 MW biomass power plant located in Linn County, Oregon. The plant began operating in 2007 and utilizes wood and wood waste as its primary fuel source. It consists of a single generator. The facility is owned by Freres Lumber Co. and operated by Invenergy Services LLC. Evergreen BioPower is interconnected to the PacifiCorp - West balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year of reported data, Evergreen BioPower generated 47,390 MWh of electricity, achieving a capacity factor of 25.7%. The plant ranks third out of eight biomass facilities in Oregon and 56th out of 97 nationwide.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - West (PACW)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.2K MWh
Latest Month
47.4K MWh
Annual Generation
25.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.817 lb/MWh
SO₂
0.137 lb/MWh
CH₄
0.387 lb/MWh
N₂O
0.051 lb/MWh
Capacity Factor
20.6%
Annual Net Gen
38 GWh
CO₂eq
24 lb/MWh
Subregion
WECC Northwest
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $73.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
LMP Node
EVERGBIO_NODEO
Pricing Hub
—
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Evergreen BioPower LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.