26.8 MW Hydro operating in Grant, WA
26.8 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1987
Operating Since
Coordinates
47.6164, -119.2992
County
Grant, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Columbia Basin Hydropower | — | — |
| Owner(s) | East Columbia Basin Irr Dist, Quincy-Columbia Basin Irr Dist, South Columbia Basin Irr Dist | — | — |
| Status | Operating | — | — |
Main Canal Headworks is a 26.8 MW hydroelectric power plant located in Grant County, Washington. The plant began operating in 1987 and utilizes conventional hydroelectric technology. It has one generator and is owned and operated by Columbia Basin Hydropower. The plant's primary fuel source is water (WAT).
In the most recent year of reported data, Main Canal Headworks generated 103,306 MWh of electricity, achieving a capacity factor of 43.8%. The plant operates within the Avista Corporation balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 39th largest power plant in Washington out of 75, and nationally it is ranked 430 out of 1464 plants. Recent news articles indicate activity related to deals involving the plant.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Avista Corporation (AVA)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
103.3K MWh
Annual Generation
43.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $61.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Main Canal HeadworksForward forecasts, scenario decomposition, and risk-decision tooling for this asset.