27.2 MW Wood Waste operating in Navajo, AZ
27.2 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
2008
Operating Since
Coordinates
34.5045, -110.3343
County
Navajo, AZ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Novo Biopower LLC | Novo Biopower LLC | — |
| Owner(s) | Novo Biopower LLC | NPS Capital | — |
| Status | Operating | operating | — |
The Novo BioPower Plant is a 27.2 MW biomass power plant located in Navajo County, Arizona. The plant began operating in 2008 and is owned by NPS Capital and operated by Novo Biopower LLC. The primary fuel source for the plant is wood and wood waste (WDS). It consists of a single generator utilizing wood/wood waste biomass technology.
The plant operates within the Arizona Public Service Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In the state of Arizona, the Novo BioPower Plant is ranked 1 out of 2 biomass plants, and nationally it is ranked 48 out of 97. The plant's latest annual generation was 168,105 MWh, achieving a capacity factor of 70.4%.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Arizona Public Service Company (AZPS)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
14.4K MWh
Latest Month
168.1K MWh
Annual Generation
70.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
3 lb/MWh
NOx
3 lb/MWh
SO₂
0.472 lb/MWh
CH₄
1 lb/MWh
N₂O
0.175 lb/MWh
Capacity Factor
73.7%
Annual Net Gen
176 GWh
CO₂eq
86 lb/MWh
Subregion
WECC Southwest
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $95.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Novo BioPower PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.